
| home | design | construction | reference | catalog |
| ramps | sample parks | contact | maintenance |
Skatepark Stages:
Stage 2
This Stage is the 'second year' build phase of the project.
This example includes:Conversion from Halfpipe to Bowl
Expanded Quarterpipe
Grind Rail (built in Stage 1)
Manual Pad (built in Stage 1)
Grind Ledge (built in Stage 1)
Expanded Bank
Funbox w/ DK Ledge
Stage 3 will expand this stage by:
Converting the Funbox into a Pyramid
Adding 2 Quarterpipes
Adding 2 Banks